Projects
Where is Avonmouth Resource Recovery Centre (formerly Severn Road) up to?
Each status below comes from a named source and date.
Energy from waste · England, South West
Planning
- Planning
- Granted
- 6 Apr 2011
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- 15 Apr 2017
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 1 Dec 2020
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Energy from waste project, epj_bb96dd795c69f4be
Measures
- Rated power
- 34.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published