Grid

Projects

Projects

Where is Stormy Down (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · Wales

Planning

Planning
Granted
19 Apr 2015
DESNZ REPD, 3 Aug 2026
Construction
Built
25 Aug 2015
DESNZ REPD, 3 Aug 2026
Operational status
Operational
3 Oct 2016
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_bc1051c27ac3a06c

Measures

Rated power
3.0 MW
Connection capacity
Not published
Storage energy
Not published