Grid

Projects

Projects

Where is Sefter Farm AD Plant (Farm AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, South East

Planning

Planning
Granted
2 Oct 2008
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
1 Jun 2010
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_bd25975a6b234d9c

Measures

Rated power
1.0 MW
Connection capacity
Not published
Storage energy
Not published