Where is A G Parfett And Son, Didsbury Road - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, North West
Planning
- Planning
- Revised
- 15 Dec 2022
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_c37eacb20af16e6f
Measures
- Rated power
- 0.5 MW
- Connection capacity
- Not published
- Storage energy
- Not published