Grid

Projects

Projects

Where is Bolton Road Waste Treatment and Renewable Energy Facility (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, Yorkshire and Humber

Planning

Planning
Granted
8 May 2012
DESNZ REPD, 3 Aug 2026
Construction
Built
10 Sep 2012
DESNZ REPD, 3 Aug 2026
Operational status
Operational
13 Jul 2015
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_c3963f99860bc313

Measures

Rated power
4.0 MW
Connection capacity
Not published
Storage energy
Not published