Where is Dragon Long Meadow - Solar farm up to?

Each status below comes from a named source and date.

Solar PV · Wales

Planning

Planning
Granted
14 Jan 2022
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
13 Mar 2023
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_c55e664c3e9599f6

Measures

Rated power
9.9 MW
Connection capacity
Not published
Storage energy
Not published