Projects
Where is Kenninghall Renewable Energy Facility (Waste AD) up to?
Each status below comes from a named source and date.
Anaerobic digestion · England, Eastern
Planning
- Planning
- Revised
- 30 Dec 2010
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_c5c777528aa8cfb8
Measures
- Rated power
- 1.2 MW
- Connection capacity
- Not published
- Storage energy
- Not published