Grid

Projects

Projects

Where is Kenninghall Renewable Energy Facility (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, Eastern

Planning

Planning
Revised
30 Dec 2010
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_c5c777528aa8cfb8

Measures

Rated power
1.2 MW
Connection capacity
Not published
Storage energy
Not published