Where is Westminster Lodge Leisure Centre - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, Eastern
Planning
- Planning
- Application submitted
- 15 Mar 2022
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_c649f9cc1cfb01fa
Measures
- Rated power
- 0.2 MW
- Connection capacity
- Not published
- Storage energy
- Not published