Grid

Projects

Projects

Where is Sandhill Anaerobic Digestion Plant (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, Yorkshire and Humber

Planning

Planning
Granted
6 May 2009
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
1 Jan 2011
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_c9f6d266c16a7b4f

Measures

Rated power
2.0 MW
Connection capacity
Not published
Storage energy
Not published