Projects
Where is Lock Street Energy from Waste Plant up to?
Each status below comes from a named source and date.
Advanced conversion · England, North West
Planning
- Planning
- Revised
- 6 Jan 2012
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Advanced conversion project, epj_cac9fe3482a3587c
Measures
- Rated power
- 10.6 MW
- Connection capacity
- Not published
- Storage energy
- Not published