Where is Graythorpe Energy Centre up to?
Each status below comes from a named source and date.
Energy from waste · England, North East
Planning
- Planning
- Granted
- 21 Aug 2020
- DESNZ REPD, 3 Aug 2026
- Construction
- Not started
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Energy from waste project, epj_cff76b2b0fc706ef
Measures
- Rated power
- 49.5 MW
- Connection capacity
- Not published
- Storage energy
- Not published