Where is Lower Strode Road - Solar Photovoltaic Panels up to?

Each status below comes from a named source and date.

Solar PV · England, South West

Planning

Planning
Granted
30 Aug 2022
DESNZ REPD, 3 Aug 2026
Construction
Not started
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_d17d727a0d835cb0

Measures

Rated power
0.3 MW
Connection capacity
Not published
Storage energy
Not published