Where is Land at Grange Farm up to?
Each status below comes from a named source and date.
Anaerobic digestion · England, East Midlands
Planning
- Planning
- Granted
- 4 Jun 2013
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- 1 Dec 2013
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 1 Dec 2014
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_d3015946abad0bb8
Measures
- Rated power
- 1.1 MW
- Connection capacity
- Not published
- Storage energy
- Not published