Grid

Projects

Projects

Where is Leeming Bar (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, Yorkshire and Humber

Planning

Planning
Granted
2 Apr 2015
DESNZ REPD, 3 Aug 2026
Construction
Built
15 Jul 2015
DESNZ REPD, 3 Aug 2026
Operational status
Operational
15 Jan 2016
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_d85d92c6dc38e3e9

Measures

Rated power
1.5 MW
Connection capacity
Not published
Storage energy
Not published