Grid

Projects

Projects

Where is East London Sustainable Energy Facility (Thames Gateway Power facility) up to?

Each status below comes from a named source and date.

Advanced conversion · England, London

Planning

Planning
Revised
8 May 2006
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Advanced conversion project, epj_d9e4a9a03d28bed5

Measures

Rated power
13.0 MW
Connection capacity
Not published
Storage energy
Not published