Projects
Where is East London Sustainable Energy Facility (Thames Gateway Power facility) up to?
Each status below comes from a named source and date.
Advanced conversion · England, London
Planning
- Planning
- Revised
- 8 May 2006
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Advanced conversion project, epj_d9e4a9a03d28bed5
Measures
- Rated power
- 13.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published