Projects
Where is Gaineamhach Hydro Scheme Powerhouse up to?
Each status below comes from a named source and date.
Hydro · Scotland
Planning
- Planning
- Revised
- 28 Jul 2016
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Hydro project, epj_e0e7dbb88dfb43bc
Measures
- Rated power
- 2.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published