Where is Teesside Green Energy Plant (Waste AD) up to?
Each status below comes from a named source and date.
Anaerobic digestion · England, North East
Planning
- Planning
- Granted
- 11 Jul 2011
- DESNZ REPD, 3 Aug 2026
- Construction
- Built
- 25 Apr 2013
- DESNZ REPD, 3 Aug 2026
- Operational status
- Operational
- 20 Feb 2015
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Anaerobic digestion project, epj_e10fbcb99e6832cd
Measures
- Rated power
- 4.8 MW
- Connection capacity
- Not published
- Storage energy
- Not published