Grid

Projects

Projects

Where is Pineham AD Plant (Waste AD) up to?

Each status below comes from a named source and date.

Anaerobic digestion · England, South East

Planning

Planning
Abandoned
DESNZ REPD, 3 Aug 2026

Connection

Connection
Anaerobic digestion project, epj_e3b3f959ec5a68a1

Measures

Rated power
1.0 MW
Connection capacity
Not published
Storage energy
Not published