Grid

Projects

Projects

Where is Seghill Household Waste Recovery Centre -Solar Panels up to?

Each status below comes from a named source and date.

Solar PV · England, North East

Planning

Planning
Application submitted
8 Dec 2025
DESNZ REPD, 3 Aug 2026
Operational status
Proposed
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_e4de9c7929bd23cf

Measures

Rated power
5.8 MW
Connection capacity
Not published
Storage energy
Not published