Solar PV · England, Yorkshire and Humber
Planning
- Planning
- Revised
- 21 Jan 2025
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_e744a31e748ce8dc
Measures
- Rated power
- 0.7 MW
- Connection capacity
- Not published
- Storage energy
- Not published