Where is Loxley Waste Water Treatment Work,Storrs Bridge Lane - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, Yorkshire and Humber
Planning
- Planning
- Refused
- 1 Aug 2023
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_e991b09867ec888f
Measures
- Rated power
- 0.6 MW
- Connection capacity
- Not published
- Storage energy
- Not published