Projects
Where is Longwell Green Leisure Centre - Solar panels up to?
Each status below comes from a named source and date.
Solar PV · England, South West
Planning
- Planning
- Granted
- 25 Jul 2024
- DESNZ REPD, 3 Aug 2026
- Construction
- Not started
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_f08e54a84b63ab85
Measures
- Rated power
- 0.1 MW
- Connection capacity
- Not published
- Storage energy
- Not published