Grid

Projects

Projects

Where is Manston Solar Farm extension (Westwood) up to?

Each status below comes from a named source and date.

Solar PV · England, South East

Planning

Planning
Granted
24 Jul 2013
DESNZ REPD, 3 Aug 2026
Construction
Built
DESNZ REPD, 3 Aug 2026
Operational status
Operational
28 Mar 2014
DESNZ REPD, 3 Aug 2026

Connection

Connection
Solar PV project, epj_f448d0da16956063

Measures

Rated power
9.2 MW
Connection capacity
Not published
Storage energy
Not published