Where is Limberlost Solar Farm up to?

Each status below comes from a named source and date.

Battery · England, South East

Planning

Planning
Granted
DESNZ REPD, 3 Aug 2026
Construction
Built
11 Nov 2015
DESNZ REPD, 3 Aug 2026
Operational status
Operational
11 Dec 2015
DESNZ REPD, 3 Aug 2026

Connection

Connection
Battery project, epj_f54ab4d687841fee

Measures

Rated power
0.3 MW
Connection capacity
Not published
Storage energy
Not published