Projects
Where is Evans Concrete Products, Pye Bridge Industrial Estate - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, East Midlands
Planning
- Planning
- Application submitted
- 25 Mar 2024
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_fd1540fc8bc5a360
Measures
- Rated power
- 0.3 MW
- Connection capacity
- Not published
- Storage energy
- Not published