Where is Tamerton Road, Roborough - Solar Panels up to?
Each status below comes from a named source and date.
Solar PV · England, South West
Planning
- Planning
- Granted
- 6 Apr 2022
- DESNZ REPD, 3 Aug 2026
- Construction
- Not started
- DESNZ REPD, 3 Aug 2026
- Operational status
- Proposed
- DESNZ REPD, 3 Aug 2026
Connection
- Connection
- Solar PV project, epj_ff81a9b997e123de
Measures
- Rated power
- 1.0 MW
- Connection capacity
- Not published
- Storage energy
- Not published