What does it cost to keep Britain's electricity in balance?
In financial year 2026/27 to 15 Nov 2026, NESO's daily balancing costs sum to £2.45bn. 2 days missing from NESO's file (8 Nov, 14 Nov). The total is partial. The Constraints category is 90.5% of that daily file. The current final BSUoS tariff is £12.49/MWh (1 Oct 2026 to 31 Mar 2027), about £31.23 a year for Ofgem's typical household (2,500 kWh). It leaves out network losses. Excluding VAT. A separate estimate of electricity traded with neighbouring countries is below; it is not part of the balancing cost. Sources: NESO daily balancing costs and BSUoS fixed tariffs (Supported by National Energy SO Open Data); trade estimate from Elexon BMRS (Contains BMRS data © Elexon Limited copyright and database right 2026.).
Calendar year 2025: imports £3.63bn, exports £1.12bn, net imports £2.51bn (estimates). Half-hourly flow × Market index price (Elexon MID). Not an invoice, and not part of the balancing cost.
What NESO spends each day to keep Great Britain's electricity supply matched to demand, and who pays. A separate estimate of interconnector trade sits below; it is not part of the balancing cost.
Latest day
£9.66m
15 Nov 2026
This financial year so far
£2.45bn
1 Apr to 15 Nov. 2 days missing from NESO's file (8 Nov, 14 Nov). The total is partial.
BSUoS tariff
£12.49/MWh
Fixed by NESO for 1 Oct 2026 to 31 Mar 2027.
Constraints
90.5%
of balancing cost in NESO's daily file, 1 Apr 2026 to 15 Nov 2026.
BSUoS per household
£31.23
A year: £12.49/MWh × 2,500 kWh (Ofgem's typical household). Excludes losses. Excluding VAT. Method
Costs through 15 Nov 2026. Source: NESO (balancing).
Daily balancing cost
Six NESO categories. Negatives, such as income from selling surplus power, are drawn below zero. A gap is a day NESO did not publish. Incomplete means the day has fewer half-hours than the clock.
- Energy imbalance
- Frequency control
- Positive reserve
- Negative reserve
- Constraints
- Other
- Total
Monthly balancing cost: constraints and the other five categories
Constraints against the other five categories. The dashed line is the final BSUoS tariff in force at the start of the month, in £/MWh, on its own axis.
- Constraints
- Other categories
- BSUoS tariff, £/MWh
Estimated value of electricity traded with GB's neighbours
Estimate: half-hourly flow × Market index price (Elexon MID). Not an invoice, and not part of the balancing cost.
90 days to 22 Nov 2026: imports £1.33bn · exports £621.43m · net imports £708.87m (estimates)
- Imports
- Exports
- Net imports (imports minus exports)
Swipe for more columns
| Link to | Imports (est. £) | Exports (est. £) | Net imports (est. £) | Energy, imports + exports (GWh) |
|---|---|---|---|---|
| France | £498.66m | £131.59m | £367.07m | 4,142 GWh |
| Belgium | £101.74m | £62.37m | £39.36m | 1,081 GWh |
| Netherlands | £119.86m | £56.77m | £63.10m | 1,142 GWh |
| Norway | £365.43m | £8.16m | £357.28m | 2,219 GWh |
| Denmark | £233.54m | £79.28m | £154.27m | 2,029 GWh |
| Ireland | £6.99m | £204.59m | −£197.61m | 1,355 GWh |
| Northern Ireland | £4.08m | £78.67m | −£74.60m | 541 GWh |
What balancing is
Electricity is bought and sold as if the network could carry power anywhere in Great Britain without limit. It can't. From one hour before each half-hour (gate closure), NESO pays generators and users to change what they planned, so that supply matches demand and no line is overloaded.
The tools
- Balancing Mechanism bids (turn down) and offers (turn up), at the price each unit offers.
- Reserve, held ready to respond.
- Frequency response, on a scale of seconds.
- Voltage and inertia services.
- Trades, including trades with interconnectors. Those trades already sit inside the balancing categories.
Why it costs money
NESO puts thermal constraints, limits on how much the grid can carry and especially the B6 boundary from Scotland into England, at around two-thirds of its broader 2025/26 balancing total of £3.1 billion (The balancing act, 3 Nov 2026). On this page the Constraints category is a narrower daily total, 90.5% of the six-category file this financial year so far. NESO says turn-up of replacement plant, often gas, is the larger part of constraint cost. Some turn-down payments to wind cover ROCs or CfDs that would have been paid if the plant had generated. NESO also says a little under £0.5bn was paid to wind farms to turn down in 2025/26. That wind figure is not the Constraints category (Part 2: Outturn, 9 Nov 2026). Constraint cost and volume are also on the constraints page.
Who pays
NESO recovers it through BSUoS (Balancing Services Use of System), a charge in £/MWh that electricity suppliers pay and pass on in bills. NESO sets it each December for the following April to March. The current tariff is £12.49/MWh, about £31.23 a year (£12.49/MWh × 2,500 kWh, Ofgem's typical household from 1 Jul 2026). It leaves out network losses. Excluding VAT. NESO puts balancing at 4.3% of a typical household electricity bill in 2025/26.
BSUoS also covers NESO's running costs. The final tariff covering today is £12.49/MWh, Fixed Tariff 8, 1 Oct 2026 to 31 Mar 2027. A draft of £21.67/MWh is published for 1 Apr 2027 to 30 Sept 2027. The household figure is £31.23 a year. Ofgem's typical domestic consumption values set 2,500 kWh from 1 Jul 2026. Tariffs are on the NESO fixed tariff file.
Two totals for the same year
NESO's Chief Economist put balancing costs at £3.1 billion in 2025/26 (3 Nov and 9 Nov 2026). The 2025/26 annual report is not yet published. The daily file on this page is a narrower set of six categories, £2.43bn in 2025/26. A day is the sum of those six categories, and a year is the sum of its days. The two totals are not added together. This page uses the daily file.
Interconnectors and trade
No. Grid multiplies each half-hour's flow by the Market index price (Elexon MID). The traders who use the cables settle the actual payments. It is an estimate, not an invoice, and it is never added to the balancing cost.
Estimate: half-hourly flow × Market index price (Elexon MID). Not an invoice, and not part of the balancing cost.
Cables run to France, Belgium, the Netherlands, Norway, Denmark, Ireland and Northern Ireland. In 2025 DESNZ recorded UK imports of 43.9 TWh and UK exports of 14.2 TWh, 29.7 TWh net. Those DUKES figures are for the United Kingdom, not Great Britain. DUKES 2026, chapter 5.
Traders and suppliers settle the power. When the price differs on each side, the gap is congestion rent and goes to the interconnector owners. Not every link is in the cap and floor. Where it applies, income above the cap comes back through lower network charges, and income below the floor is topped up from those charges (Ofgem's cap and floor handbook). NESO's own interconnector trades are already inside the balancing categories and are not added again.
What NESO says would lower it
NESO points to new circuits from north to south, including the Eastern Green Links, and less exposure to the gas price. NESO also says that, without the wind, the gas would still have to run. Most of the constraint cost is the replacement energy, not the payment to turn wind down. See The balancing act.
Methodology and limits
- NESO and Elexon revise files after first publication. Grid checks once a day and keeps the revision.
- A day with fewer half-hours than the clock is marked incomplete. It is not filled out.
- A day that is missing from the file is left as a gap. It is not filled with zero. A year-to-date total that skips a day is partial.
- A negative category is a negative number. It is not dropped and it is not flipped.
- History runs from the 2017/18 financial year.
- The trade estimate skips a half-hour that has flow and no Market index price, and marks that day incomplete.
Daily balancing costs. Supported by National Energy SO Open Data. NESO Open Data Licence. Contains BMRS data © Elexon Limited copyright and database right 2026. Elexon BMRS licence. Grid's derived data is CC BY 4.0. More on the method is in methodology, with the sources on data sources and freshness on data health.
Frequently asked questions
- What is balancing?
- Electricity is bought and sold as if the network could carry power anywhere in Great Britain without limit. It can't. From one hour before each half-hour (gate closure), NESO pays generators and users to change what they planned, so that supply matches demand and no line is overloaded.
- Who pays the balancing cost?
- NESO recovers it through BSUoS (Balancing Services Use of System), a charge in £/MWh that electricity suppliers pay and pass on in bills. NESO sets it each December for the following April to March. The current tariff is £12.49/MWh, about £31.23 a year (£12.49/MWh × 2,500 kWh, Ofgem's typical household from 1 Jul 2026). It leaves out network losses. Excluding VAT. NESO puts balancing at 4.3% of a typical household electricity bill in 2025/26.
- Is the interconnector figure a bill?
- No. Grid multiplies each half-hour's flow by the Market index price (Elexon MID). The traders who use the cables settle the actual payments. It is an estimate, not an invoice, and it is never added to the balancing cost.